Upper McAlpine Creek - Sanitary Sewer Interceptor Project
This was one of C7ÓéÀÖ¹Ù·½Íøվ’s first progressive design build Sanitary Sewer projects with Charlotte Water. The project consisted of over 2 miles of 30â€� gravity sewer, a mile and a half of trench rock blasting and 49 manholes. A total of 36 bypass pumping setups were required to construct the new 30â€� mainline that tied in to an active sewer. The project began in March of 2021 and wrapped up in January of 2023 and it was a huge success for both C7ÓéÀÖ¹Ù·½ÍøÕ¾ and Charlotte Water.